There has been steady and very careful progress of the turbine across the site and into situ at the top of two piles of railway sleepers.
The winches have been secured to the concrete base and a carefully calculated 'A' frame has now been constructed to take the weight of the turbine whilst the castors are removed from the frame and later the front sleeper pile will be carefully dismantled to allow the screw to be manoeuvred down the ramp.
The pictures below give various views of the turbine resting at the top of the concrete run.