Friday, 30 January 2009

Outage - (29/1)

An update on the outage we have had earlier this week which at the same time allowed us to perform some remedial work on the limit switches that control the sluice gate.

In the early hours of Monday morning the generator disconnected from the National Grid, it does this as a precaution when the voltage on the grid doe snot match the voltage we produce.

Unfortunately due to an issue we had with the sluice gate limit switches caused Archie to 'free wheel' which in turn caused a drive belt between the gearbox and generator to deteriorate.

It was all hands to the pumps whilst we replaced the drive belt and resolved the limit switch issues with excellent team work from LSP, Mann Power consulting and our friends at WRE.

We have also had a lot of visitors to the site, Tuesday and Wednesday, mostly arranged by h2OPE as part of their advice and information sessions held in Manchester for other groups thinking of going down the same the same route as Torrs Hydro.

The Co-op Group also visited with energy managers from Co-operatives around the country for whom they purchase power and help with strategies to reduce energy use and carbon footprint.

Archie is now running smoothly again.

Sunday, 25 January 2009

Saturday, 24 January 2009

Seven Leaping Salmon - (24/1)

For those that missed tonight's Manchester Evening News (full page spread on page 3) here is the web version and extra pictures of the seven leaping salmon.

We will post some pictures of the past few days on the blog shortly.

Friday, 23 January 2009

Torrs Hydro in the press - (23/1)




Look out for pictures in tomorrows Manchester Evening News and next weeks Stockport Express of Simon in action over teh last few days - so far we have a total of 4 salmon that have been created with another one on it way.

The artist will be on site until 2:00pm tomorrow (Saturday) - so come and see an artist in action.

Thursday, 22 January 2009

Fish, fish and more fish - (23/1)

What a fantastic transformation of a Sycamore tree alongside Torrs Hydro - try and get yourself down to site on Saturday as the engine house will be manned all day so if you ask nicely you may get a brief tour of the inside !

Take a look at Kens video to see work in progress for the tree which is scheduled to be completed on Saturday.

100,000 kWh and counting - (22/1)


On Monday evening we smashed through the 100,000 kWh barrier - we know its only numbers, but it is a significant milestone for everyone concerned.

By the way, 100,000 kWh is enough electricity to keep a light bulb running for nearly 200 years !

Wednesday, 21 January 2009

Update - (21/1)


We now have a excellent power display installed at Torrs Hydro courtesy of Radius UK which gives a real time display of current output.


Reminder that for the rest of this week and Saturday we have a resident tree sculptor at Torrs Hydro creating leaping fish with a cherry picker, axes, chain saws and other exciting things !