Thursday, 26 June 2008
Strong lads - (26/06)
Wednesday, 25 June 2008
Thats a lot of water in that river ! - (25/06)
A somewhat bizarre picture with a flying JCB and workforce with heads poking out of the water.

Carefully being moved into position the frame for the stone archway.
My thanks go to Alan Jennings for these great pictures.
Tuesday, 24 June 2008
Into the river we go - (24/06)
At this stage of the project it was time to open up the tail race out into the main river by breaking through the existing mill wall that had retained the river for the past 150 years. This in itself brings challenges as two diggers had to be lowered into the River Goyt (suitably above water to ensure environment agency guidelines are maintained) and then a process of removing years of debris and ensuring the correct depth for the exit.
Welcome to The Mersey Basin Trust - (24/06)
Monday, 23 June 2008
Busy, busy, busy - (23/06)
What a hectic place the site is at the moment - and not only so much happening form a construction point of view there are lots of interesting things for the public to watch as well.
Today we lowered two diggers into the River Goyt to enable the tail gate to be suitably formed (removing years of debris and creating the exit channel).
The debris is the lifted from the river in a skip using a large crane - at the same time this is happening the remaining railway sleepers are being hoisted out of the concrete run and stacked ready for sale.
Some pictures of todays happenings will follwo later this afternoon and remember keep those suggestions coming in for a name for our Archimedes screw to secretary@torrshydro.co.uk